Reference Plant Engineering
MBA
Wrexham
Plant planning, delivery, construction, commissioning, trial operation and turnkey handover of a plant for the mechanical-biological treatment of household waste
Key Facts
Plant planning, delivery, construction, commissioning, trial operation and turnkey handover of a plant for the mechanical-biological treatment of household waste.
Treatment of Household Waste
Wrexham
- Client:
FCC Environment - Throughput capacity:
(50,000 Mg/a), of which 33,500 Mg/a household waste and 16,500 Mg/a commercial waste - Commissioning:
March/April 2015 - Mechanical processing with the help of:
- Pre-shredder
- Screening drum
- Ballistic separator
- Non-ferrous separator
- Iron separators
- NIR devices
- Recycling materials:
- Plastic, foils
- Paper, film
- Cardboard
- Hard plastics (PET/HDPE etc.)
- Wood
- Textiles
- Fuel:
Processing of the remaining fraction into a fuel for combined heat and power plants, cement and lime works, etc. - Biological treatment:
Tunnel drying in 5 tunnels (35m x 8m x 5m) - Air technology:
Hall exhaust air and exhaust air from the tunnel drying are captured via the installed air technology and cleaned via an acid scrubber and biofilter.