Recycling Plant for Commercial and Household Waste
Dubai
In addition to engineering and implementation planning, the scope of the order included the procurement, manufacture and delivery of the entire plant technology and components as well as installation and commissioning.
Customer:
Ramky Enviro Engineers Middle East
Contract signing:
December 2017
Acceptance:
December 2019
Operation:
The plant is operated by Farz, a joint venture between Ramky and Imdaad.
Input:
The day to day industrial and commercial waste from the world's largest offshore industrial park, Jafza Jebel Ali Free Zone; In addition, the majority of the waste from the WORLD EXPO, which will take place in Dubai from October 2021, is to be treated in the recycling plant.
Throughput:
Around 700 tonnes of commercial waste and 500 tonnes of household waste per day
Eggersmann Components:
- 2 stationary TEUTON Shredders
- 2 BRT HARTNER Screen Drums
- 2 BRT HARTNER Ballistic Separators
- Eggersmann Conveying Technology
Key Facts:
The waste process, allows valuable recycling fractions of about 25 - 30% to be recovered, which correspondingly relieves the current landfill. The emissions of CO2 and CH4 also lowered considerably. At the same time, RDF is obtained, thus reducing the use of fossil fuels in the cement plants.
Gunnar Beyer