Reference Plant Engineering
Mechanical-biological Treatment Plant
Poznan
Engineering and implementation planning, procurement, manufacture and delivery of machine and conveyor technology as well as assembly and commissioning of parts of a plant for mechanical and biological treatment.
Key Facts
Engineering and implementation planning, procurement, manufacture and delivery of machine and conveyor technology as well as assembly and commissioning of parts of a plant for mechanical and biological treatment.
Mechanical-biological Treatment
Poznan
- Client:
ZZO Poznan - Commissioning:
October 2014 - Handover of the system in operation:
June 2016 - Input:
Biowaste / green waste -> digestate / green waste - Throughput:
52.000 Mg/a - Mechanical processing with the help of:
- Screening drum
- Feed hopper with decompactor
- Magnetic separator
- Shredder
- Biological treatment with the aid of:
Dry fermentation in 7 tunnels (29 x 4.45 x 5.6), followed by tunnel composting in 7 tunnels (25 x 5.45 x 5) - Materials obtained for further processing:
- Compost
- Metal
- Special components:
Tunnel entry device (TEG) - Participating companies of the Eggersmann Group besides EAB:
Eggersmann Polska

Gunnar Beyer
Sales Manager
Eggersmann Plant Engineering
Recycling plants
Phone +49 5734 6690-227
g.beyer(at)f-e.de