Fermentation plant BEKON Mini

Galmiz (Switzerland)

Planning, delivery, installation, commissioning and trial operation of a biowaste treatment plant for production of biogas by dry fermentation.

Retention:
July 2014

Commissioning:
March 2015

Throughput:
9,000 Mg/a green waste

Components of the plant:

  • 4 fermentation boxes, external dimension 12.5 m x 5.75 m x 3.75 m
  • Bio filters
  • Percolate tank
  • Sand trap
  • biogas storage
  • technical rooms
  • CHP
  • Emergency flare
  • Safety devices