Fermentation plant BEKON Mini
Galmiz (Switzerland)
Planning, delivery, installation, commissioning and trial operation of a biowaste treatment plant for production of biogas by dry fermentation.
Retention:
July 2014
Commissioning:
March 2015
Throughput:
9,000 Mg/a green waste
Components of the plant:
- 4 fermentation boxes, external dimension 12.5 m x 5.75 m x 3.75 m
- Bio filters
- Percolate tank
- Sand trap
- biogas storage
- technical rooms
- CHP
- Emergency flare
- Safety devices
Dr. Rolf Liebeneiner
Head of Sales
Biological Waste Treatment
Recycling Plants
Fon +49 5734 6690-0
r.liebeneiner(at)f-e.de