for composting plant in Luxembourg

Eggersmann Anlagenbau built a new composting plant in Monnerich, Luxembourg for the client syndicate Minett-Kompost. The official inauguration took place on 1 July 2022 in the presence of Luxembourg's Minister of the Environment Joëlle Welfring.

Eggersmann Anlagenbau replaced an aging composting plant of the "Wendelin" type with state-of-the-art technology. Due to the hall geometry of the old plant, the longest Eggersmann rotting tunnels to date, 42 metres in length, were built here. A total of 8 rotting tunnels with tunnel filling unit as well as the associated conveying and exhaust air technology were included in the scope of supply. In addition, a FORUS shredder, a TERRA SELECT trommel screen and a star screen deck, also from Eggersmann, are used in the new plant - all are operated purely electrically.

The plant processes a large part of Luxembourg's organic and green waste. The throughput amounts to 20,000 tons per year. 

 

Historical Document on the Company’s History

This press release served, at a specific point in the past, to inform the public about an event that has since concluded. The statements and data contained herein regarding environmental and sustainability aspects reflect the situation at that time. This is a historical document which was sent to the press in this form. As such, in the interests of transparency, its content has deliberately not been updated retrospectively, as it served as a source of quotations and a basis for external articles. Any changes to the source would no longer guarantee intersubjective verifiability. For this reason, the press release remains available here in the press archive as well. 
The statements made in the press release are no longer maintained as current promotional or image-related statements. 
If you have any questions regarding the current status of the issues covered in this press release, please contact us at pr(at)f-e.de.