RDF plant Middle East

Engineering and planning, procurement, production and delivery of the complete plant engineering as well as installation and commissioning.

Retention:
September 2012

Throughput:
540,000 Mg/a

Operational time:
at least 6,200 Mg/a

Input:
municipal solid waste, commercial and industrial waste

Recovery rate:
more than 50%

Materials for further processing:

  • RDF (160,000 Mg/a)
  • Paper and cardboard (20,000 Mg/a)
  • Ferrous
  • Non-Ferrous
  • Plastic
  • PET
  • PVC
  • biowaste / organic waste
Mechanical treatment:
  • Shredder
  • Screendrum
  • Air belt separator
  • Bag opener
  • Ballistic separator
  • Non-ferrous-separator
  • Ferrous-separator
  • NIR-devices
Commissioning:
End of 2015

Pictures

Receiving hall with shredder and bag opener
Screendrum and conveyor technology
Air belt separators
Conveyor technology
View into the hall
View into the hall