Plant for ash treatment, Singapore

Engineering and planning, procurement, production and delivery of the complete plant engineering as well as installation and commissioning.

The contained metal elements are removed from the slag. The metal-free slag is used as building material for a new island.

Customer:
Remex Mineralstoff GmbH

Retention:
August 2014

Commissioning:
June 2015

Throughput:
600.000 Mg/a

Machines for metal separation:

  • screens
  • ADR modules
  • magnets
  • non-ferrous separator

Pictures

Dosingbunker
Stangesizer
Flowscreen
Conveyors and ferrous separator